Radiant Marine Design & Services Limited
SL. No. Project Name Client Contract Amount

(incl. Currency)

Period(YY/MM)
Start Finish
1 Supervision of New Dormitory and Guest House A &A Textiles USD 3,15,567.00 06.08.2021 Ongoing
2 Supervision of Connection road to Factory at Kaliganj Multazim Spinning Mills Ltd USD 2,15,785.00 23.03.2021 Ongoing
3 Supply and Installation of Double lane Steel truss for Highway Bridges with Concrete deck for 1 (one) span of 107.25 meter (in between P8 & P11) for the Incomplete Bridge over the Lohalia River at Sadar Upazila under Patuakhali District during the year 2018-2019 LGED, Patuakhali 21,17,84,106.00 2019

June

On-Going
4 Construction Supervision of factory Building and Warehouse A  Puls Sweater Ltd. 79,836,000.00 12.3.2020 12.9.2021
5 Interior design & Building Construction supervision Triangles GROUP 98,489,464.00 010.5.2019 17.09.2021
6 Guest House Design & Construction Supervision Projects Afrin Spinning Mills Ltd. 75,894,500.00 16.02.2020 01.11.2021
7 Connecting Road & Boundary wall Construction Supervision SSR GROUP 89,982,600.00 10.05.2021 24.11.2021
8 Construction of Supervision of administrative building Construction work ANWAR LANDMARK 88,764,,500.00 05.04.2020 03.01.2021
9 Construction of Supervision of works Dormitory building project at BSCIC M/S ANIK CONSTRUCTION 87,454,587.00 15.05.2019 12.11.2020
10 Rest House and dormitory building design & construction supervision Pubali Construction Company Limited 75,454,578 20.09.2019 09.07.2020
11 Supervision of Factory building Interior Work (including thai, aluminium, glass door, ceiling). Nahid Group 4,78,654.00 2017

January

2017

June

12 Designing and supervision of building construction work. Nahid Group 3,98,156.00 2018

February

2018

September

13 Designing of Factory building Construction work. Century Spinning Mills Ltd. 5,88,548.00 2016

August

2017

July

14 Supervising construction works of factory building (knit

Factory) project at tongi, gazipur.

ACE APPAREL LTD 5,75,100.00 2020

January

2020

November

15 Connecting Road Construction Supervision of Mesh Garments (pvt) Unit-1 Ltd. Unibond Engineering & Technologies 4,87,800.00 2018

February

2018

October

16 Administrative building extension work design & supervision at tongi, gazipur, dhaka Renasa Trade International 4, 68, 540.00 2020

December

2021

June

17 Supervision of Factory building extension work. Knit Concern Group 2,45,445.00 2019

March

2019

November

18 Painting and Redesigning of Factory Building Viyellatex 3,20,166.00 2019

July

2020

February

19 Mechanical Designing Factory building work Monno Fabrics Ltd. 5,80,500.00 2021

January

2021

October

20 Factory building construction supervision Afrin Spinning Mills Ltd. 4,98,870.00 2017

December

2018

November

21 Construction Supervision of Boundary Wall Bigapple Builders Ltd. 4,36,000.00 2018

September

2019

June

22 Electrical Work for Factory building Stylecraft Limited 4,80,900.00 2018

February

2018

November

23 4 Nos. Steel Mooring Buoy

Dia: 5500mm, Height: 2360mm

BM Energy(BD) Ltd, 1206/A Nasiraba, Bayzid Thana Road, Chottagram. 2,95,00,000.00 2016

July

2018

March

24 Different steel Works for Gumti Bridge OSJI Joint Venture 10,00,000,00.00 2016

February

2018

October

25 Supply & installation of 101.035 meter Double lane steel truss for highway bridge with provision of concrete deck for one span of for the under construction Sheikh Lutfor Rahman Bridge ( Patgati Bridge) Roads & Highways Department 16,98,49,412.19 2012

April

2013

June

26 Supply & Supervision during carriage & installation of double lane steel truss for highway with provision of concrete deck for 1 (One) span of 115.00 meter under construction surma bridge over the River Surma at Sunamgonj Roads & Highways Department 12,63,48,920.00 2013

March

2014

May

27 Construction & Supply of shore pipe with flanges at both sides (Length of each pipe: 20 ft) with nut-bolts and rubber gasket; (a) 20 inch pipe—–350 pcs, (2) 18 inch pipe—– 1530 pcs VOSTA LMG Karnafuly Joint Venture Consortium Ltd.

Strand road,  Majhirghat, Chittagong-4000

80,00,000.00 2013 2013
27 Preparation of design & new construction  of series of coastal bulk carrier of 2200 DWT capacity;

(1) MV River Dream-1,(2) MV River Dream-2, (3) MV River Dream-3, (4)  MV River Dream-4

River Dream Navigation Ltd. Land View, 8th Floor, Gulshan, Dhala-1212 19,50,000.00 2012 2013
28 Design, Supply, Installation, Testing and Commission of Structure for Fuel unloading Station at Daudkandi 50 MW Power Plant CCC Engineering Ltd.

H-485, R-8, DOHS Baridhara, Dhaka-1206

62,00,000.00 2011 2012
29 Design, Supply, Installation, Testing and Commission of Structure for Fuel unloading Station at Baghabari 50 MW Power Plant on Trunkey Basis. 70,00,000.00 2011 2012
30 Supply of 708 meter Single Lane Portable Steel Bridge of Different Spans Roads & Highways Department 14,90,29,035.32 2014

March

2015

Mar

31 Supply of 475 meter Single Lane Portable Steel Bridge of Different Spans Roads & Highways Department 21,38,01,631.00 2017 May 2018
32 Supply and Supervision during Carriage & Installation of Double lane Steel truss for Highway Bridges with provision of concrete deck for 1 (one) span of 115.00 meter (in between P3 & P4) for the under construction Bridge over the River Surma at Chhatak, Sunamgonj under Sunamgonj road division of Sylhet Road Circle, Sylhrt during the year 2018-2019 (GD-1). Roads & Highways Department 15,73,61,575.00 2018

December

2021
33 Procurement of 573 meter Single Lane Portable Steel Bridge of Different Spans for the Roads and Highways Department Roads & Highways Department 29,54,54,792 2020

January

2021